FIGURES AND TABLES  

Figure 1.1     Effect of an error
Figure 1.2     Resources triangle
Figure 1.3     Effect of identification time on cost of errors
Figure 1.4     Fundamental test process
Figure 1.5     Iteration of activities
Figure 2.1     Waterfall model
Figure 2.2     V-model for software development
Figure 2.3     Iterative development
Figure 2.4     Top-down control structure
Figure 2.5     Bottom-up integration
Figure 3.1     Stages of a formal review
Figure 3.2     Formality of reviews
Figure 4.1     State transition diagram of the hill-walker’s watch
Figure 4.2     State transition diagram
Figure 4.3     Use case example
Figure 4.4     Flow chart for a sequential program
Figure 4.5     Flow chart for a selection (decision) structure
Figure 4.6     Flow chart for an iteration (loop) structure
Figure 4.7     Flow chart representation for Example 4.5
Figure 4.8     Control flow graph showing subgraphs as nodes
Figure 4.9     Control flow graph with subgraphs expanded
Figure 4.10     Flow chart for Coverage example
Figure 4.11     The hybrid flow graph
Figure 4.12     Paths through the hybrid flow graph
Figure 4.13     Paths through the hybrid flow graph
Figure 4.14     Paths through the hybrid flow graph
Figure 4.15     Simplified control flow graph: a decision
Figure 4.16     Simplified control flow graph: locations of a decision in a loop
Figure 4.17     Example of how simplified control flow graphs are read and interpreted
Figure 4.18     Control flow graph for Exercise 4.11
Figure 4.19     Test case for examination question E4
Figure 4.20     Test case for examination question E5
Figure 4.21     Flow chart for Exercise 4.6
Figure 4.22     Control flow graph for Exercise 4.6
Figure 5.1     Levels of independent testing
Figure 5.2     Test plans in the V-model
Figure 5.3     iTesting Executive Dashboard
Figure 5.4     Incidents planned/raised
Figure 6.1     Test tool payback model
Figure 6.2     Hotel system architecture
Figure 6.3     An integrated set of tools
Figure 6.4     Test execution tools payback model
Figure 6.5     Test harness for middleware
Figure 6.6     Test tool implementation process
Figure A1.1     State transition diagram for question 8
Figure A1.2     State transition diagram for question 9
Figure A1.3     Control flow diagram for question 18
Figure A1.4     Flow graph for question 19
Table 1.1     Comparative cost to correct errors
Table 4.1     ST for the hill-walker’s watch
Table 5.1     Features of independent testing
Table 5.2     Test plan sections
Table 5.3     Test summary report outline
Table 5.4     Test incident report outline
Table 6.1     Configuration traceability
Table 6.2     Hotel system extract (20/10/2014)
Table 6.3     Hotel system extract (5/11/2014)
Table 6.4     Exit criteria
Table 6.5     Types of test tool
Table A1.1     State transition table for question 9
..................Content has been hidden....................

You can't read the all page of ebook, please click here login for view all page.
Reset