Appendix B
Nine-Bus Power System Case Study

Table B.1 Branch Data

From Bus To Bus R, pu X, pu B, pu Limit, MW
1 4 0 0.0576 0 200
4 5 0.017 0.092 0.158 200
5 6 0.039 0.17 0.358 100
3 6 0 0.0586 0 250
6 7 0.0119 0.1008 0.209 100
7 8 0.0085 0.072 0.149 200
8 2 0 0.0625 0 200
8 9 0.032 0.161 0.306 200
9 4 0.01 0.085 0.176 200

Table B.2 Generator Data

Generator G1 G2 G3
Nominal power (MVA) 128 247.5 192
Type Hydro Steam Steam
Speed (rpm) 180 3600 3600
VL–L (KV) 16.5 18.3 13.8
img 0.146 0.8958 1.3125
img 0.0608 0.1198 0.1813
img 0.205 0.155 0.22
img 0.0969 0.8645 1.2578
img 0.0969 0.1969 0.25
img 0.221 0.143 0.292
img 0.0336 0.0521 0.0742
img 8.96 6 5.89
img 0.02 0.02 0.02
img 0.00002 0.535 0.6
img 0.02 0.02 0.02
img 2.8544e-3 2.8544e-3 2.8544e-3
H (on 100 MW) 23.64 3.01 6.4
Reactance values are in pu on 100 MVA base, and all generators are equipped with a governor and PSS.

Table B.3 Load Data

Load Load A Load B Load C
Bus No. 9 5 7
Active power (MW) 125 90 100
Reactive power (MVAR) 50 30 35
Number of blocks 6 4 5

Table B.4 Exciter Data

Low Pass Filter Regulator Exciter Output Limits
Generator Tr Ka Ta Ke Te Efmin Efmax
G1 20e−3 200 0.001 1 0 0 7
G2 20e−3 200 0.001 1 0 0 12.3
G3 20e−3 200 0.001 1 0 0 12.3