With the Requirements Life Cycle Management Assess Requirements Changes task, there are the following key inputs and outputs:
- Inputs: Change (proposed), requirements, and designs
- Outputs: Requirements change assessment and designs change assessment
As an output to this task, the proposed change has been assessed both to a requirement or a design. The status of this means that the change assessment is completed.